Timeline
The Energy Island in the Baltic Sea will consist of two fields of offshore wind turbines. a substation located on Bornholm and cables between the turbines, the station and recipients og energy on Zealand and abroad.
The offshore wind farms will be located 15 km south and south-west of Bornholm. The offshore wind farms will produce 3.2-3.8 GW of power per year from 2030. This is equivalent to the power consumption of approximately three million households.
See the timeline below for more information.
Timeline Energy Island Bornholm
×